Harley Davidson makes motorcycle engines

Paper , Order, or Assignment Requirements

Harley Davidson makes motorcycle engines in its Milwaukee plant. For the most recent month, budgeted production was 3,300 engines. The standard power cost is $9.20 per machine-hour. The company’s standards indicate that each engine requires 2.1 machine-hours. Actual production was 3,400 engines. Actual machine-hours were 7,160 machine-hours. Actual power cost totaled $61,815.
a)What is the rate variances for the variable overhead item power cost?
b)What is the efficiency variance of the variable overhead item power cost?

find the cost of your paper
You can leave a response, or trackback from your own site.